A review after one year of Jese Architecture Bucheon rooftop waterproofing commissioned after last year’s rainy season.
📰 Member News

A review after one year of Jese Architecture Bucheon rooftop waterproofing commissioned after last year’s rainy season.

We summarized from the customer's perspective the process of entrusting waterproofing work to Jesae Construction due to stains on the ceiling and cracks in the roof after last year's rainy season. This is a review of how I felt that everything from background preparation to finishing and cleaning was neat, and that it was a good decision not to postpone the construction after another rainy season a year later.

📅 ⏱ 13분 읽기 📊 7,482자

After the rainy season ended last year, I entrusted the roof of my villa in Bucheon to Jesae Architecture. This project started because of a stain that had spread on the ceiling of the top floor, but after cleaning up the cracks and water accumulation on the rooftop floor and installing a new waterproofing layer, the finish was really neat. Now that a year has passed and I've experienced the rainy season and wind and rain again, I think I did a good job of getting the inspection in the fall instead of putting it off.

The reason why I couldn't put it off any longer after the rainy season ended last year

At first, there was a palm-sized stain on one side of the ceiling. I thought it would dry up when the rain stopped, so I thought about just wallpapering it again, but after the next heavy rain, the edges of the stain got wider and a damp smell remained. When I went up to the roof, I saw that the old waterproofing layer was cracked here and there, and water remained near the drain even after the rain had stopped.

The rainy season is over, so I thought it would be okay until next year, but the winter snow and spring rain were too much for me. While looking for companies doing rooftop waterproofing work in Bucheon, Incheon, and the metropolitan area, I applied for a consultation after seeing villa and townhouse construction cases on Jese Architecture's official website. I liked the fact that, rather than simply asking about the square footage, they also checked the last construction period, location of water leaks, and whether there was water stagnation.

It was good that the cause was explained first during the consultation.

At the site, we not only looked at the location of the ceiling stain, but also walked around the entire rooftop to check for cracks in the floor, lifting of the existing paint, corners of the parapet, and drains. He explained that even in areas that seemed fine to me, when I looked closer, I saw areas where the surface had weakened, and that I needed to also look at the direction in which the water was draining.

It was easy to understand because it did not necessarily require tearing everything down or recommending only the most expensive method, but it clearly explained the parts to be cleaned up from the current floor, the parts to be repaired, and the scope to create a new waterproof layer.It was easy to compare because the estimate did not only tell the result amount, but also allowed you to hear the order in which the background preparation, crack repair, waterproofing, and finishing were carried out.

Rooftop waterproofing process conducted in the fall after the rainy season

On the day of construction, we first moved the items on the rooftop and organized the work area. After removing the weakened existing paint film, dust, and foreign substances, we carefully repaired cracks, corners, and the area around the drain. Afterwards, we created a waterproof layer according to the background condition, allowed it to dry sufficiently, and then proceeded with the finishing work.

I thought that waterproofing work would be completed with just one color visible at the end, but when I actually observed it, more time was spent on cleanup and repairs before that. Every time the process changed, the Jese Construction work team explained where the process was going today, and they kept checking to see if there was rain in the forecast and didn't rush things unreasonably.

What I was most satisfied with right after construction was the neat finish and organization.

The color of the completed rooftop was evenly organized, making the whole look brighter. Even areas with complicated finishes, such as the corners where the wall meets the floor, around pipes, and drains, were neat and tidy without any messy spills. I was also satisfied with the fact that construction materials and trash were cleaned up and public staircases and access routes were inspected.

Before entrusting the construction work, I was worried that life would be very inconvenient for a few days, but it was easy to inform the residents of the work time and entrance route by informing them in advance. Because it is a company close to the Bucheon site, consultation and schedule coordination were quick, and when I asked questions, I was able to get answers tailored to the process.

The change I feel now after a year

More than anything, I felt different when the rainy season came again this year.In the past, I checked the top ceiling first whenever it rained hard, but now the stains from last year have not spread again and there is no damp smell. After the rain stopped, I went up to the roof and saw that the area around the drain was more organized than before and the area where water remained for a long time had decreased.

Although photos immediately after construction are important for waterproofing work, I think satisfaction can only be known after one season, especially the rainy season and typhoons. After using it for a year, my impression is, ‘I did a good job of looking into the cause from the beginning and leaving it to a place that did the basic work properly.’ The best thing was that I could feel relieved when it rained again, rather than having a construction project that was only shiny on the outside.

Bucheon If you are concerned about waterproofing after the rainy season in the Incheon metropolitan area,

In my experience, it is better to take pictures of the entire rooftop, cracks, water pools, and drains rather than just taking pictures of the interior traces of rain leaks. Consultation will be quicker if you write down when the last waterproofing was done and when the stains got bigger after it rained. When comparing quotes, check not only the price, but also whether surface preparation and crack repair are included, how drying time is secured, and what the aftercare conditions are.

Based in Bucheon, Jese Architecture carries out waterproofing of roofs of houses, villas, and commercial buildings and painting of exterior walls in metropolitan areas such as Incheon and Seoul. According to official information, it can take about 2 to 5 days to build a typical villa rooftop depending on the condition, and a 2-year after-sales service is also provided depending on the materials and construction methods. Since conditions vary at each site, it is recommended that you check the exact schedule and estimate in person.

After the rainy season last year, I thought about ‘waiting a little longer’, but looking back now, organizing it right away in the fall was the best decision. If you are worried just by hearing the news of rain due to water leaks in Bucheon, Incheon, or the metropolitan area, I recommend that you first check with Jese Construction and the cause of the rooftop before covering up the indoor stains.


Source: Jese Architecture , Jese Architecture Blog , Jese Architecture Naver Blog , Web Support Center Blog , Web Support Center Naver Blog


#Jese Architecture #Jese Construction Review #Rooftop Waterproofing After Rainy Season #Autumn Waterproofing Construction #Bucheon Rooftop Waterproofing #Incheon Rooftop Waterproofing #Metropolitan area rooftop waterproofing #Villa leak #Urethane waterproofing #Rooftop water retention #Leakage construction review #Clean waterproofing construction


This article was written with the help of Bucheon Web Support Center Written by . You can consult about creating a homepage or blog at a reasonable cost considering AEO, GEO, and SEO at the web support center .